Send procurement the original review decisions and a file list with their versions. Ask the recipient to confirm what arrived, identify any missing or different files, and state the next action for each product. Acceptance limited to one check must keep that limit when the decision changes hands.
Use this guide after reviewers have made their decisions. The worked transfer below is entirely hypothetical: its products, identifiers, filenames, roles and decisions are invented to explain correspondence. It describes no Afri Exports customer, transaction, test result or internal approval procedure. It sets no technical acceptance limits.
If requirements are still being gathered, start with the earlier buyer task.
Worked transfer: two lines, different next actions
Imagine a buyer’s technical coordinator sends procurement packet DEMO-H1 revision 1. It contains a natural white sesame line and a green-cardamom line. The coordinator asks procurement to seek a quotation only for the sesame line within its recorded decision scope, and to return the cardamom line for clarification.
- Line S — natural white sesame: demonstration sample S-01, lot S-LOT, specification S-SPEC revision 2. Decision S-DEC revision 1 accepts appearance only for quotation discussion; application and document checks remain open. The packet lists S-DEC revision 1 and S-PHOTO revision 1, and both are attached.
- Line C — green cardamom: demonstration sample C-01, lot C-LOT, specification C-SPEC revision 3. Decision C-DEC revision 2 remains pending and refers to report C-REPORT revision 3 and attachment C-ANNEX revision 1. The packet instead contains C-REPORT revision 2, and C-ANNEX is absent.
Partial acceptance here means the sesame reviewer accepted appearance only. It does not mean that the whole sesame line passed every requirement, or that the cardamom line inherits that decision. Procurement can carry out the specified quotation enquiry while keeping the sesame exclusions visible. Neither line has purchase or shipment authorization in this example.
The recipient replies with a checked receipt
A useful reply names the received versions and the action the recipient will take. In this hypothetical reply, procurement checks the files against the sender’s list before answering:
- Packet DEMO-H1 revision 1 received. Line S: S-DEC revision 1 and S-PHOTO revision 1 received; sample, lot and specification references agree with the transfer list. Next action: procurement sends a quotation enquiry carrying the appearance-only decision and the open application and document questions.
- Line C: C-DEC revision 2 received. C-REPORT revision 2 received, although the decision cites revision 3. C-ANNEX revision 1 was listed but not received. Next action: procurement asks the technical coordinator for the cited report and missing annex; the line stays pending.
- The technical coordinator owns the reply on Line C and must confirm a response date. Procurement records that date when agreed; it does not invent one. No combined order is authorized by this receipt.
The receipt distinguishes a file that arrived from evidence that supports the decision being transferred. Renaming revision 2 as revision 3 would hide the mismatch. Sending an unqualified “all approved” would also erase the sesame decision’s limited scope.
Resolve the discrepancy without overwriting the first packet
Suppose the coordinator then supplies C-REPORT revision 3 and C-ANNEX revision 1 in packet DEMO-H1 revision 2. Procurement acknowledges those exact files and retains revision 1 as superseded correspondence. The cardamom reviewer must confirm whether C-DEC revision 2 still applies or issue a revised decision. Receiving the missing files alone does not change the pending decision.
If the reviewer changes the sample, lot or specification reference, identify the affected line in the revised transfer. Ask the reviewer which earlier decision it replaces. Keep the old and replacement references together so procurement can follow the change without reassessing the technical evidence itself.
Send only the question the recipient can answer
For the example’s sesame quotation enquiry, identify the natural white request and attach its limited decision. For cardamom, the immediate task is to obtain the missing evidence from the coordinator; a catalogue page cannot resolve that discrepancy.
The sesame line in this example can accompany this product enquiry.
If a certificate question remains on that line, identify the operation and certificate concerned. Afri Exports’ TBS certification covers its Mtwara facility handling cashew and sesame; it does not extend to coffee, cardamom, vanilla or avocados. A producer’s, processor’s or packhouse’s certificate remains that operator’s credential.
Use the published scope to frame the unresolved certificate question.
Send the sesame enquiry with its decision reference, exclusions and named reply contact. Keep the pending cardamom clarification in the same correspondence.
Use a short receipt for your own transfer
- Packet reference and revision; sender and recipient; date received: ____
- Per line: decision, sample, lot and specification references; exact files and versions received: ____
- Missing files or version differences; question sent to; agreed reply date: ____
- Per line: decision scope carried forward; next action and owner: ____
- Replacement packet and decision references; earlier version superseded: ____
This receipt records a transfer of existing decisions. It does not evaluate a sample, approve a supplier, confirm destination requirements or authorize purchase, shipment or import. Keep any authority to place an order in the buyer’s separate approval process.